Jump to content

Edinburgh Waverley railway station

Coordinates: 55°57′08″N 3°11′21″W / 55.9521°N 3.1893°W / 55.9521; -3.1893
From Wikipedia, the free encyclopedia
(Redirected from Waverley station)

Edinburgh Waverley

Waverley Dhùn Èideann
National Rail
View of Edinburgh Waverley from the east
General information
LocationEdinburgh
Scotland
Coordinates55°57′08″N 3°11′21″W / 55.9521°N 3.1893°W / 55.9521; -3.1893
Grid referenceNT257737
Owned byNetwork Rail
Platforms20
Other information
Station codeEDB
IATA codeZXE
ClassificationDfT category A
Websitewww.networkrail.co.uk/communities/passengers/our-stations/edinburgh-waverley/
History
Original companyEdinburgh, Leith and Newhaven Railway
Edinburgh and Glasgow Railway
North British Railway
Key dates
22 June 1846North Bridge built by NBR[1]
17 May 1847General Station built by E&GR[1]
17 May 1847Canal Street built by EL&NR[1]
April 1866NBR demolished existing stations; replaced with Edinburgh Waverley[1]
18 April 1966Renamed Edinburgh[1]
?Renamed Edinburgh Waverley
Passengers
2019/20Decrease 23.088 million
 Interchange Increase 1.792 million
2020/21Decrease 2.958 million
 Interchange Decrease 0.203 million
2021/22Increase 13.618 million
 Interchange Increase 0.860 million
2022/23Increase 18.213 million
 Interchange Increase 1.237 million
2023/24Increase 21.308 million
 Interchange Increase 1.466 million
Listed Building – Category A
FeatureRailway station
Designated12 November 1991
Reference no.LB30270[2]
Notes
Passenger statistics from the Office of Rail and Road. Station usage figures saw a large decrease in 2020/21 due to the COVID-19 pandemic

Edinburgh Waverley (also known simply as Edinburgh;[3] Scottish Gaelic: Waverley Dhùn Èideann) is the principal railway station serving Edinburgh, Scotland.[4][5] It is the second busiest station in Scotland, after Glasgow Central. The station serves as the northern terminus of the East Coast Main Line, 393 miles 13 chains (393.16 miles; 632.7 kilometres) from London King's Cross, although some trains operated by London North Eastern Railway continue to other Scottish destinations beyond Edinburgh.[6]

The Waverley Steps entrance on the north side of the station, June 2024

Location

[edit]
View of the station from the Scott Monument in 2015
View of the station from Edinburgh Castle, June 2024

Waverley station is situated in a steep, narrow valley between the medieval Old Town and the 18th century New Town. Princes Street, the premier shopping street, runs close to its north side. The valley is bridged by the North Bridge, rebuilt in 1897 as a three-span iron and steel bridge, on huge sandstone piers. This passes high above the station's central section, with the greater half of the station being west of North Bridge.

The central booking hall is just west of the northern massive stone pier of the bridge and cleverly hides it within its bulk. Waverley Bridge lies at the western end of the station (though platforms extend below it) and it is this road which, by means of ramps, formerly afforded vehicular access to the station and still provides two of the six pedestrian entrances to the station.

The valley to the west of the station, formerly the site of the Nor Loch, is the public parkland of Princes Street Gardens. Directly east of the station are St Andrew's House, which accommodates part of the Scottish Government and Governor's House.

Previous stations

[edit]
Location of Waverley and (former) lines emanating from the station

Edinburgh's Old Town, perched on a steep-sided sloping ridge, was bounded on the north by a valley in which the Nor Loch had been formed. In the 1750s overcrowding led to proposals to link across this valley to allow development to the north. The "noxious lake" was to be narrowed into "a canal of running water", with a bridge formed across the east end of the loch adjacent to the physic garden. This link was built from 1766 as the North Bridge and at the same time plans for the New Town began development to the north, with Princes Street to get unobstructed views south over sloping gardens and the proposed canal. The loch was drained as work on the bridge proceeded. In 1770 a coachbuilder began work on properties feued at the corner between the bridge and Princes Street, and feuers on the other side of the street strongly objected to this construction blocking their views to the south. A series of court cases ended with the decision that the buildings nearing completion could stay, immediately to the west of that some workshops would be allowed below the level of Princes Street, and further west a park would be "kept and preserved in perpetuity as pleasure ground" in what became Princes Street Gardens.[7]

In the mid-1830s proposals for a railway from Glasgow running along the gardens to a station at the North Bridge were set out in a prospectus with assurances that the trains would be concealed from view, and smoke from them "would scarcely be seen". An association of "Princes Street Proprietors" who had feued houses in the street, and had spent large sums turning the "filthy and offensive bog" of the Nor Loch into quiet gardens, strongly opposed the railway and in late 1836 put forward their case against the Act of Parliament for the railway. The Edinburgh and Glasgow Railway opened in 1842 with its terminus at Haymarket railway station, stopping short of Princes Street. In the Railway Mania of the 1840s, the railway sought another Act of Parliament allowing access along the gardens, and at the same time two other railways proposed terminus stations at the North Bridge site. By then several of the Princes Street properties were shops or hotels with an interest in development, and agreement was reached in 1844 on walls and embankments to conceal the Edinburgh and Glasgow railway line in a cutting, with compensation of almost £2,000 for the proprietors.[8]

The North Bridge station was opened on 22 June 1846 by the North British Railway as the terminus for its line from Berwick-upon-Tweed. The Edinburgh and Glasgow Railway's General station opened on 17 May 1847, on the same day as the Canal Street station of the Edinburgh, Leith and Newhaven Railway, serving Leith and Granton via a long rope-hauled tunnel under the New Town. The collective name "Waverley", after the Waverley Novels by Sir Walter Scott, was used for the three from around 1854 when the through "Waverley" route to Carlisle opened. Canal Street station was also known as Edinburgh Princes Street,[1] not to be confused with the Caledonian Railway railway station later built at the West End which was named Princes Street station from 1870.

The present Waverley station

[edit]
Aberdeen express leaving Edinburgh Waverley in 1957

From 1866 to 1868, the North British Railway acquired the stations of its rivals, demolished all three and closed the Scotland Street tunnel to Canal Street. The present Victorian station was built on the site. Along the tracks of this first station, Hanna, Donald & Wilson built some very impressive roofs. The station was extended in the late 19th century. In 1897, the impressive glass dome was added.[9] Waverley has been in continual use since, under the auspices of the North British, the LNER, British Railways (rebranded as British Rail after 1965), Railtrack and now Network Rail. From its opening in its current form by the eastward tunnelled extension from Haymarket, Waverley has been the principal railway station in Edinburgh. From 1870 to 1965, the city had a second major station, Princes Street, operated by the rival Caledonian Railway, but this was never as important as Waverley.

British Rail brought railway electrification in 1991 with electric trains on the East Coast Main Line to Glasgow Central and via York to London King's Cross.

The station's large size and the unusual topography of its surroundings mean that it contains a large amount of valuable, centrally located land. The station's successive owners, British Rail, Railtrack and its current owner Network Rail have been criticised[according to whom?] for underusing the valuable city-centre spaces available within, there being a legal covenant preventing any upwards extension, which would obstruct the view of Arthur's Seat from Princes Street. The elevated walkway linking the Waverley Steps (from Princes Street to Market Street) has been upgraded with the recommissioning of the suburban platforms (at the south) and provision of additional through platforms to the north to serve the increased proportion of through rail traffic.

During 2006 and 2007, parts of Waverley were extensively refurbished, including two new through platforms and the electrification of platforms 12 to 18 in preparation for electric trains from the Airdrie-Bathgate Rail Link and future lines in Scotland to be electrified by the EGIP (Edinburgh/Glasgow Improvement Project).[10]

From 2010 to 2012, the glazing of the roof of Waverley station was entirely replaced with new strengthened clear glass panels, replacing the old 34,000 m2 (370,000 sq ft) of mixed surfaces including felt, cloudy wired glass and plastic sheet. Part of a £130 million upgrade, this has greatly increased the amount of natural light in the station.[11][12][13]

Recent developments

[edit]
Waverley Station roof from the north-east in 2016

From 2012 to 2014, improvements included: a new set of covered escalators at Waverley Steps leading to Princes Street (narrowing the huge set of previously open-air steps); a rebuilt and widened entrance from Market Street; a rebuilding of the canopies on the southern suburban line; a restoration of the central space in the ticket hall; and major improvements to the Calton Road access. Internally, several new lifts and escalators have greatly aided circulation.[14]

A new drop-off point and disabled parking/access was added on the Calton Road access in 2014.

In mid-2017, as part of the Edinburgh to Glasgow Improvement Programme, platform 12 was extended. At the same time the former Motorail bay platforms were extended into a former car park area and taxi rank to allow platforms 5 and 6 to be extended to accommodate additional London North Eastern Railway services.[15] Platforms 5 and 6 were brought into use on 28 February 2019.[16]

Work began in 2020 to reopen a corridor from the ticket office to the eastern concourse; this will also see the toilets replaced and a Changing Places facility installed.[17]

North British Hotel

[edit]
Former North British Hotel above the station

The railway company constructed a hotel beside their station. The North British Hotel, adjacent to the station at the corner between Princes Street and North Bridge, on the site of the coachworks, opened in 1902.[7] It closed in 1988, but was re-opened by new owners as the Balmoral Hotel in 1991.[18]

Services

[edit]
The station concourse, June 2024

Several train operating companies serve the station. The typical off-peak service in trains per hour (tph) and trains per day (tpd) as of the December 2022 timetable change is as follows:

London North Eastern Railway[19]
CrossCountry[20]
Avanti West Coast[21]
TransPennine Express[22]
Lumo[23]
Caledonian Sleeper[24]
ScotRail[25]

London North Eastern Railway also operate their Flying Scotsman service once per day to London, southbound only, departing at 0540, calling at Newcastle only, and arriving at London King's Cross exactly four hours later at 0940.

Lumo started operating services from London King's Cross to Edinburgh Waverley via Stevenage, Newcastle and Morpeth in October 2021.[26][27]

Routes – present and past

[edit]
Preceding station   National Rail National Rail   Following station
LumoTerminus
London North Eastern Railway
London North Eastern RailwayTerminus
CrossCountryTerminus
TransPennine ExpressTerminus
TerminusTransPennine Express
Avanti West Coast
ScotRail
Edinburgh–Aberdeen
ScotRail
ScotRail
ScotRail
ScotRail
ScotRail
ScotRail
ScotRail
ScotRailTerminus
ScotRail
Edinburgh–Dunbar
ScotRail
Caledonian Sleeper
Caledonian Sleeper
Southbound only
  Historical railways  
Terminus   North British Railway
NBR Main Line
  Jock's Lodge
Line open, station closed
Terminus   North British Railway
Edinburgh and Glasgow Railway
  Haymarket
Line and station open
Disused railways
Terminus
as Canal Street Station
  North British Railway
Edinburgh, Leith and Newhaven Railway
  Scotland Street
Line and station closed
Terminus   North British Railway
Edinburgh, Leith and Granton Railway
  Abbeyhill
Line and station closed
Haymarket
Line and station open
  North British Railway
Edinburgh Suburban Line
 

Layout

[edit]
Layout map of Waverley station

The main station facilities are located in the middle of what is essentially a large island platform which is surrounded by platforms on all four sides. There are 20 numbered platforms, in a clockwise direction from the north east. There are three pairs of platforms which share the same tracks.

  • There are two tracks on the north side. The northernmost track is split between Platform 20 (west) and Platform 1 (east) and the other is split between Platform 19 (west) and Platform 2 (east).
  • There are four east-facing bay platforms, Platforms 3–6.
  • There are four tracks on the south side. From north to south, these are:
    • A track which is split between Platform 11 (west) and Platform 7 (east).
    • Platform 10.
    • Platform 9, which is subdivided into "9w" (west) and "9e" (east) sections.
    • Platform 8, which is subdivided likewise.
  • There are seven west-facing bay platforms, Platforms 12–18.

Other transport connections

[edit]

Although there is currently no direct interchange, the nearest tram stop on the Edinburgh Trams service between Edinburgh Airport and Newhaven is St Andrew Square. The tram stop also serves the adjacent Edinburgh bus station, about 200 metres from Waverley station.[28] Some bus services also stop outside the station at Princes Street while taxi ranks are located outside at Market Street.

Future developments

[edit]

In March 2019, Network Rail announced proposals to redevelop Waverley station in order to meet an anticipated increase in passenger demand by 2048. The Waverley Masterplan drawn up by engineering firm Arup Group envisages the creation of a new mezzanine level concourse above the main platforms to facilitate passenger circulation within the station, with a link through to the neighbouring Waverley Mall shopping centre. As part of the redevelopment, the entrance ramps from Waverley Bridge into the station would be removed and the new concourse would be enclosed in plate glass to provide panoramic views over the Old Town. The plans also make reference to a "transport hub", although a direct interchange with Edinburgh Trams is not specified.[29][30]

See also

[edit]

References

[edit]
  1. ^ a b c d e f Butt (1995), page 89
  2. ^ "Waverley Station (4 Waverley Bridge), Former Parcels Office (17 Waverley Bridge), and Waverley Bridge, (Excluding Waverley Steps), Edinburgh (Lb30270)". Archived from the original on 31 July 2020. Retrieved 17 March 2019.
  3. ^ "Edinburgh Station".
  4. ^ Network Rail: Our Stations – Edinburgh Waverley Archived 28 August 2013 at the Wayback Machine 27 August 2013
  5. ^ Edinburgh | Scotrail Archived 15 June 2015 at the Wayback Machine 14 June 2015
  6. ^ "Commercial information" (PDF). Complete National Rail Timetable. London: Network Rail. May 2013. p. 43. Archived from the original (PDF) on 4 September 2013. Retrieved 5 June 2013.
  7. ^ a b Youngson, A.J. (1966). The Making of Classical Edinburgh. Edinburgh University Press. pp. 12–14, 86–90.
  8. ^ Youngson 1966, pp. 275–278.
  9. ^ "Waverley Station Dome Protection". Millar-Callaghan. 11 August 2013. Archived from the original on 29 June 2020. Retrieved 27 June 2020.
  10. ^ "Edinburgh Waverley Train Station". EdinburghGuide.com. Archived from the original on 10 August 2013. Retrieved 21 August 2013.
  11. ^ edg (13 January 2010). "New Roof For Waverley Station Moves Step Closer". EdinburghGuide.com. Archived from the original on 8 September 2013. Retrieved 21 August 2013.
  12. ^ "Edinburgh Waverley". Network Rail. Archived from the original on 19 August 2013. Retrieved 21 August 2013.
  13. ^ Dalton, Alastair (15 April 2009). "Stronger Waverley roof will save public from bridge jumpers". The Scotsman. Edinburgh. Archived from the original on 21 October 2013. Retrieved 21 October 2013.
  14. ^ edg (28 September 2009). "Work Starts on £130m Refurbishment for Edinburgh Waverley". EdinburghGuide.com. Archived from the original on 19 October 2014. Retrieved 21 August 2013.
  15. ^ "EGIP - New images of extended Waverley platforms released". Archived from the original on 7 November 2017. Retrieved 30 October 2017.
  16. ^ "Two new, extended platforms open at Edinburgh Waverley". Global Railway Review. 1 March 2019. Archived from the original on 5 August 2020. Retrieved 11 November 2020.
  17. ^ "Passenger facilities upgrade for Edinburgh Waverley". Network Rail Media Centre. Archived from the original on 18 November 2020. Retrieved 16 November 2020.
  18. ^ "The Historical Milestones". Rocco Forte Hotels. Retrieved 17 June 2023.
  19. ^ "Download our current timetables | LNER". Retrieved 24 January 2023.
  20. ^ "Updated UK Train Times & Timetables | CrossCountry" (PDF). Retrieved 12 March 2024.
  21. ^ "Train Timetables | Train Schedules | Avanti West Coast". Retrieved 24 January 2023.
  22. ^ "Timetables | Download Timetables | First TransPennine Express". Retrieved 24 January 2023.
  23. ^ "Train Timetable | Schedule & Planned Works | Lumo". Retrieved 24 January 2023.
  24. ^ "Timetables | Caledonian Sleeper". Retrieved 24 January 2023.
  25. ^ "ScotRail Train Times | Plan your Journey | ScotRail". Retrieved 24 January 2023.
  26. ^ Applications for the East Coast Main Line Archived 3 June 2016 at the Wayback Machine Office of Rail & Road 12 May 2016
  27. ^ London to Edinburgh by Lumo: Inaugural train, 22 October 2021, retrieved 29 December 2021
  28. ^ "St Andrew Square | Edinburgh Trams". Edinburgh Trams. Retrieved 19 April 2024.
  29. ^ Swanson, Ian (26 March 2019). "Edinburgh Waverley masterplan: Major revamp would see mezzanine floor above platforms". Edinburgh Evening News. The Scotsman. Archived from the original on 27 March 2019. Retrieved 27 March 2019.
  30. ^ "Edinburgh Waverley Masterplan". Network Rail. 21 March 2019. Archived from the original on 27 March 2019. Retrieved 27 March 2019.

Bibliography

[edit]
[edit]